Ara
Toplam kayıt 5, listelenen: 1-5
Minimizing the maximum lateness in a scheduling problem with a time-dependent learning effect: A non-linear programming model
(Gazi Univ, Fac Engineering Architecture, 2008)
In traditional scheduling problems, most literature assumes that the processing time of a job is fixed. However, there are many situations where the processing time of a job depends on the starting time or the position of ...
Selecting of Monorail projects with analytic hierarchy process and 0-1 goal programming methods in Ankara
(Pamukkale Univ, 2017)
Uncontrolled increasing population, unplanned urbanization and enhancement in private vehicles number have revealed the of congestion traffic problem in urban area. These conditions have led to increase the need to remodeling ...
Modelling And Solving The Railway Scheduling Problem
(Gazi Univ, Fac Engineering Architecture, 2014)
In this study, to find solutions to problems related to delays in train suggestions were made. In this paper, first of all Yenicubuk-Cetinkaya railway which have 16 stations and 6 trains worked on, was handled and 0-1 ...
A mathematical model proposal for maintenance strategies optimization of the most critical electrical equipment groups of hydroelectric power plants
(Pamukkale Univ, 2019)
Maintenance is a process that makes a high-level contribution to the sustainability goal of the manufacturing facilities defined as uninterrupted, high-quality level, economic, efficient; reliable and environmentally ...
Solving scheduling problem with time dependent learning effect to number of tardy jobs and range of lateness criteria
(Gazi Univ, Fac Engineering Architecture, 2012)
In traditional scheduling problems, most literature assumes that the processing time of a job is fixed. However, there are many situations where the processing time of a job depends on the starting time or the position of ...