Basit öğe kaydını göster

dc.contributor.authorOzcan, Evrencan
dc.contributor.authorDanışman, Tuğba
dc.contributor.authorEren, Tamer
dc.date.accessioned2021-01-14T18:16:51Z
dc.date.available2021-01-14T18:16:51Z
dc.date.issued2020
dc.identifier.citationÖzcan E., Danışman T., Eren T. (2020). Hidroelektrik santrallarda bakım çizelgeleme için hibrid bir model önerisi. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 35(4), 1815 - 1827.en_US
dc.identifier.issn1300-1884
dc.identifier.issn1304-4915
dc.identifier.urihttps://doi.org/10.17341/gazimmfd.602774
dc.identifier.urihttps://app.trdizin.gov.tr/makale/TXprd09ETTFOUT09
dc.identifier.urihttps://hdl.handle.net/20.500.12587/13366
dc.description.abstractBakım, endüstriyel işletmelerde üretim, personel ve malzeme ile eş zamanlı yönetilmesi gereken önemli bir prosestir. Bu önemli prosesin kritik aşamalarının başında bakım planlaması gelmektedir. Bakım planlaması için gerekli olan iki aşama bulunmaktadır. İlk aşama bakım stratejilerinin belirlenmesi ve ikinci aşama ise bakım çizelgelerinin oluşturulmasıdır. Bu çalışma, bakım planlamasının ilk adımını oluşturan bakım strateji seçiminin gerçekleştirildiği bir çalışmanın devamı olarak bakım çizelgelemesi için yapılmıştır. Bakım strateji seçimi için gerçekleştirilen ilk adımdaki çalışmada [5], Türkiye’deki büyük ölçekli bir hidroelektrik santralda yer alan 1330 elektriksel ekipman incelenmiş ve santral açısından kritiklik seviyesi belirlenmiştir. Çalışma sonucunda bir zaman çizelgesi doğrultusunda gerçekleştirilebilecek olan, periyodik bakım stratejisinin uygulanabileceği kritik elektriksel 7 ana ekipman grubu belirlenmiştir. Elde edilen bu sonuçlar bakım planlamasındaki bakım çizelgeleme aşamasını oluşturan bu çalışmada kullanılmıştır ve periyodik bakım stratejisinin uygulanabileceği bu kritik elektriksel 7 ana ekipman grubu için bakım çizelgesi oluşturulmuştur. Bakım çizelgeleme için yapılan bu çalışmanın ilk aşamasında santralın bir yıllık üretim tahmini Yapay Sinir Ağı (YSA) yöntemi ile gerçekleştirilmiş ve bu tahmin sonucunda elde edilen verilerden çalışma-bakım süreleri hesaplanmıştır. Tutarlı tahmin değerlerinin santralın bakım planlama gerçek ve gerekliliklerini yansıtan 0-1 Tam sayılı Programlama (TP) modelinde kullanılmasıyla, beş farklı periyodik bakım türü çizelgelenmiş ve santral işletme ve bakım gerçekleri ile tutarlı optimal bir bakım planı elde edilmiştir.en_US
dc.description.abstractMaintenance is an important process that must be managed simultaneously with personnel and materials, production in industrial enterprises. Maintenance planning comes at the beginning of the critical stages of this important process. There are two stages required for maintenance planning. The first stage is the determination of maintenance strategies and the second stage is the generation of maintenance schedules. This study is carried out for maintenance scheduling as a continuation of the maintenance strategy selection which is the first step of maintenance planning. In the first step study realized for maintenance strategy selection, 1330 electrical equipment located in a large-scale hydroelectric power plant in Turkey is examined and the criticality level is determined for the plant. As a result of the study can be realized in accordance with a timeline, 7 critical electrical equipment groups in which preventive maintenance strategy can be applied. As a result of the study can be realized in accordance with a timeline, critical electrical 7 equipment groups determined which preventive maintenance strategy can be applied. These results are used in this study which constitutes the maintenance scheduling stage in maintenance planning and the maintenance schedule has been established for these critical electrical 7 equipment groups to which preventive maintenance strategy can be applied. In the first stage of this study for maintenance scheduling, one-year generation estimation of the plant is realized by using the Artificial Neural Network (ANN) method and operating-maintenance periods are calculated from the data obtained from this estimation. By using consistent estimation values in the 0-1 Integer Programming (IP) model, which reflects the power plant's maintenance planning realities and requirements, five different types of periodic maintenance are scheduled and an optimal maintenance plan consistent with the power plant operation and maintenance facts is achieved.en_US
dc.language.isoturen_US
dc.relation.isversionof10.17341/gazimmfd.602774en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.titleHidroelektrik santrallarda bakım çizelgeleme için hibrid bir model önerisien_US
dc.title.alternativeA hybrid model proposal for maintenance scheduling in hydropower plantsen_US
dc.typearticleen_US
dc.identifier.volume35en_US
dc.identifier.issue4en_US
dc.identifier.startpage1815en_US
dc.identifier.endpage1827en_US
dc.relation.journalGazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisien_US
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster