Ara
Toplam kayıt 103, listelenen: 101-103
A hybrit approach on single server parallel machines scheduling problem with sequence dependent setup times
(Gazi Univ, Fac Engineering Architecture, 2011)
In this paper, a scheduling problem on two identical parallel machines with sequence-dependent setup times and setup operations that performed by a single server is considered. The main objective is to minimize the makespan ...
Design process model for flexible manufacturing systems and application of TAI
(Gazi Univ, Fac Engineering Architecture, 2011)
In this paper, a systematic design process model is proposed to model Flexible Manufacturing Systems (FMS). Generally, FMS systems design is complicated and cost very high as installation phase. Therefore, technical analysis ...
Neuropsychological evaluation of the hydrocephalic children: review of the literature
(Cumhuriyet Univ Tip Fak Psikiyatri Anabilim Dali, 2010)
Hydorcephalus is neurological and neurophsychological syndrom which is secondary to overloading of the cerebrospinal fluid which makes to enlarge cerebral ventricles. Therefore neurological smptoms usually could be seen ...