dc.contributor.author | Gultekin, Nazli | |
dc.contributor.author | Eren, Tamer | |
dc.date.accessioned | 2020-06-25T18:12:26Z | |
dc.date.available | 2020-06-25T18:12:26Z | |
dc.date.issued | 2014 | |
dc.identifier.citation | Gültekin N., Eren T. (2014). Demiryolu Çizelgeleme Probleminin Modellenmesi Ve Çözümü. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 29(2), 235 - 242. | en_US |
dc.identifier.issn | 1300-1884 | |
dc.identifier.issn | 1304-4915 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12587/5918 | |
dc.description | WOS: 000339152800003 | en_US |
dc.description.abstract | In this study, to find solutions to problems related to delays in train suggestions were made. In this paper, first of all Yenicubuk-Cetinkaya railway which have 16 stations and 6 trains worked on, was handled and 0-1 integer programming was proposed to reduce the delays. Train time schedules were regulated with data obtained from solution of this model and delays have been improved by 81.59 %. Also, it was shown, that the delays can be improved 96.52 % by simulating the case of changing 31 km railway line out of totally 240 km with double railway line. | en_US |
dc.language.iso | tur | en_US |
dc.publisher | Gazi Univ, Fac Engineering Architecture | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Railway scheduling | en_US |
dc.subject | tardiness | en_US |
dc.subject | 0-1 integer programming | en_US |
dc.subject | simulation | en_US |
dc.title | Modelling And Solving The Railway Scheduling Problem | en_US |
dc.type | article | en_US |
dc.contributor.department | Kırıkkale Üniversitesi | en_US |
dc.identifier.volume | 29 | en_US |
dc.identifier.issue | 2 | en_US |
dc.identifier.startpage | 235 | en_US |
dc.identifier.endpage | 242 | en_US |
dc.relation.journal | Journal Of The Faculty Of Engineering And Architecture Of Gazi University | en_US |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |