Basit öğe kaydını göster

dc.contributor.authorGultekin, Nazli
dc.contributor.authorEren, Tamer
dc.date.accessioned2020-06-25T18:12:26Z
dc.date.available2020-06-25T18:12:26Z
dc.date.issued2014
dc.identifier.citationGültekin N., Eren T. (2014). Demiryolu Çizelgeleme Probleminin Modellenmesi Ve Çözümü. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 29(2), 235 - 242.en_US
dc.identifier.issn1300-1884
dc.identifier.issn1304-4915
dc.identifier.urihttps://hdl.handle.net/20.500.12587/5918
dc.descriptionWOS: 000339152800003en_US
dc.description.abstractIn this study, to find solutions to problems related to delays in train suggestions were made. In this paper, first of all Yenicubuk-Cetinkaya railway which have 16 stations and 6 trains worked on, was handled and 0-1 integer programming was proposed to reduce the delays. Train time schedules were regulated with data obtained from solution of this model and delays have been improved by 81.59 %. Also, it was shown, that the delays can be improved 96.52 % by simulating the case of changing 31 km railway line out of totally 240 km with double railway line.en_US
dc.language.isoturen_US
dc.publisherGazi Univ, Fac Engineering Architectureen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectRailway schedulingen_US
dc.subjecttardinessen_US
dc.subject0-1 integer programmingen_US
dc.subjectsimulationen_US
dc.titleModelling And Solving The Railway Scheduling Problemen_US
dc.typearticleen_US
dc.contributor.departmentKırıkkale Üniversitesien_US
dc.identifier.volume29en_US
dc.identifier.issue2en_US
dc.identifier.startpage235en_US
dc.identifier.endpage242en_US
dc.relation.journalJournal Of The Faculty Of Engineering And Architecture Of Gazi Universityen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster