Ara
Toplam kayıt 2, listelenen: 1-2
Minimizing the maximum lateness in a scheduling problem with a time-dependent learning effect: A non-linear programming model
(Gazi Univ, Fac Engineering Architecture, 2008)
In traditional scheduling problems, most literature assumes that the processing time of a job is fixed. However, there are many situations where the processing time of a job depends on the starting time or the position of ...
Selecting of Monorail projects with analytic hierarchy process and 0-1 goal programming methods in Ankara
(Pamukkale Univ, 2017)
Uncontrolled increasing population, unplanned urbanization and enhancement in private vehicles number have revealed the of congestion traffic problem in urban area. These conditions have led to increase the need to remodeling ...