Ara
Toplam kayıt 137, listelenen: 51-60
An Inventory Classification Approach Combining Expert Systems, Clustering, And Fuzzy Logic With The Abc Method, And An Application
(Southern African Inst Industrial Engineering, 2018)
The classification of inventories requires using several criteria to control different functions of inventory management. In this study, a new classification algorithm, called the FNS (functional, normal, and small) ...
Maximum completion time under a learning effect in the permutation flowshop scheduling problem
(Univ Cincinnati Industrial Engineering, 2018)
The permutation flowshop scheduling problem under a position-based learning effect is addressed in this study. Minimization of the maximum completion time (make span) is considered for the identified problem. The mathematical ...
The single machine scheduling problem with sequence-dependent setup times and a learning effect on processing times
(Elsevier Science Bv, 2018)
For the past few years, learning effect has been receiving wide attention in the scheduling problems. There are many studies that take into account the learning effect with several structural constraints and some specific ...
Analysis of the Difficulties of SMEs in Industry 4.0 Applications by Analytical Hierarchy Process and Analytical Network Process
(Mdpi, 2018)
The concept of Industry 4.0 is seen as a recent paradigm in the manufacturing sector. The use of new production and management technologies required by the concept of Industry 4.0 is very important for small enterprises ...
A Meta Analysis Of Factors Affecting Perceived Usefulness And Perceived Ease Of Use In The Adoption Of E-Learning Systems
(Anadolu Univ, 2018)
The full potential of e-learning, a trend that is of growing importance lately, will not be reaped unless the users fully utilize the system, triggering extensive research to be conducted in order to provide valuable insight ...
A Fuzzy Analytical Network Process Approach To The Selection Of The Rail System Projects
(Yildiz Technical Univ, 2018)
Increased population density and private vehicle usage have led to traffic problems in the metropolitan city of Istanbul. At this point, Istanbul Metropolitan Municipality is trying to improve the urban transportation with ...
Goal Programming Approach For The Radiology Technician Scheduling Problem
(Yildiz Technical Univ, 2019)
Population growth is led to an increase in demand in the health sector. Health services need to be met at the maximum level in the face of increasing demand. The number of patients per each health personnel in Turkey is ...
A multi-stage satisfaction index estimation model integrating structural equation modeling and mathematical programming
(Springer, 2019)
In this study, a satisfaction index estimation model is proposed integrating structural equation modeling and mathematical programming methods with fuzzy customer data. Firstly, a deep literature survey is conducted in ...
Estimation algorithms for Weibull parameters and percentiles
(Gazi Univ, Fac Engineering Architecture, 2009)
This study concerns the use of Weibull distribution in statistical component reliability. Recently, estimation of confidence intervals and confidence lower bounds for Weibull parameters and percentiles in small samples has ...
The goal programming approach for the assembly area workload distribution problems
(Gazi Univ, Fac Engineering Architecture, 2009)
In the real life, the systems generally have multiple and confliction aims. In the airplane industry, the elements of zero defect and punctual delivery are significant for security and prestige. However, it is obvious that ...