Ara
Toplam kayıt 90, listelenen: 81-90
Ahp Model For Transition From IPv4 TO IPv6
(Gazi Univ, Fac Engineering Architecture, 2011)
In this study, one of multi criterion decision making methods, Analytic Hierarchy Process (AHP), was used to decide the best transition mechanism from IPv4 to IPv6 based on "National IPv6 Protocol Infrastructure Design and ...
The relationship between Akhism and 4C marketing mix: A view from historical perspective
(Gazi Univ, Turk Kulturu Ve Haci Bektas Veli, 2011)
Customer-oriented approaches related to solving the administrative and marketing problems of organizations have gained popularity recently. Customers who have become more selective and conscious affect the strategies of ...
Can the uncertainty in brass casting blending problem be managed? A probability/possibility transformation approach
(Pergamon-Elsevier Science Ltd, 2011)
Problems about the uncertainty in raw material compositions are a critical issue for the blending problems. It is feared that uncertainty in raw material compositions would often cause percent values of the actual blend ...
An optimization approach for brass casting blending problem under aletory and epistemic uncertainties
(Elsevier Science Bv, 2011)
A critical process in brass casting is the determination of the materials and their quantities to be added into the blend. The reason of being critical is the uncertainty about metal percentages in scrap raw materials. In ...
A possibilistic aggregate production planning model for brass casting industry
(Taylor & Francis Ltd, 2010)
This article discusses a possibilistic aggregate production planning (APP) model for blending problem in a brass factory; the problem computing optimal amounts of raw materials for the total production of several types of ...
A hybrit approach on single server parallel machines scheduling problem with sequence dependent setup times
(Gazi Univ, Fac Engineering Architecture, 2011)
In this paper, a scheduling problem on two identical parallel machines with sequence-dependent setup times and setup operations that performed by a single server is considered. The main objective is to minimize the makespan ...
Design process model for flexible manufacturing systems and application of TAI
(Gazi Univ, Fac Engineering Architecture, 2011)
In this paper, a systematic design process model is proposed to model Flexible Manufacturing Systems (FMS). Generally, FMS systems design is complicated and cost very high as installation phase. Therefore, technical analysis ...
Elite guided steady-state genetic algorithm for minimizing total tardiness in flowshops
(Pergamon-Elsevier Science Ltd, 2010)
In this research, a detailed study of the permutation flowshop scheduling problem with the objective of minimizing total tardiness is presented and a steady-state genetic algorithm solution procedure is developed for such ...
A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
(Elsevier Science Inc, 2010)
In this study, a bicriteria m-machine flowshop scheduling with sequence-dependent setup times is considered. The objective function of the problem is minimization of the weighted sum of total completion time and makespan. ...
An application of investment decision with random fuzzy outcomes
(Pergamon-Elsevier Science Ltd, 2010)
In this study, an investment problem associated with purchasing machine is solved by using decision trees method. The main difference of this paper from the others in the decision tree literature is using random fuzzy ...