Basit öğe kaydını göster

dc.contributor.authorİşler, Mesut Cemil
dc.contributor.authorÇelik, Veli
dc.contributor.authorToklu, Bilal
dc.date.accessioned2021-01-14T18:22:29Z
dc.date.available2021-01-14T18:22:29Z
dc.date.issued2009
dc.identifier.citationİşler, M. C., Çelik, V., Toklu, B. (2009). İki makine akış tipi öğrenme etkili çizelgelemede ortak teslim tarihinden mutlak sapmaların en küçüklenmesi. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 24(2), 351 - 357.en_US
dc.identifier.issn1300-1884
dc.identifier.issn1304-4915
dc.identifier.urihttps://app.trdizin.gov.tr/makale/T1RBMk1EVTE
dc.identifier.urihttps://hdl.handle.net/20.500.12587/14220
dc.description.abstractYöneylem araştırmasıyla ilgili pek çok alanda öğrenme etkisinin dikkate alındığı çalışmalar mevcuttur. Buna karşın üretim çizelgelemede bu konuyla ilgili çalışma sayısı az, akış tipinde ise daha azdır. Erken/Geç (E/G) tamamlanma problemi 1990 yılların başına kadar ağırlıklandırılmış mutlak sapma problemi olarak bilinmekteydi. Hem erken hem de geç tamamlanma zamanı çizelgeleme problemlerinde önemli ölçütlerdir. Toplam gecikme ölçütü teslim tarihlerine uyuma ilişkin göstergeleri sağlarken (erken tamamlanan işlere ilişkin sonuçları göz ardı ederek), sadece geç tamamlanan işlerin cezaları ile ilgilenir. Ancak bu eğilim tam zamanında üretim (TZÜ) konusuna olan artan ilgi ile birlikte değişmeye başlamıştır. TZÜ’de erken tamamlanma geç tamamlanma kadar önemlidir. Bu çalışmada iki makine akış tipi ortamlı çizelgelemede ağırlıklı erken/geç tamamlanma performans kriteri ve öğrenme etkili işleme özelliği dikkate alınarak bir tamsayılı programlama modeli önerilmiş ve örnek problemlerle çözüm sonuçları değerlendirilmiştir.en_US
dc.description.abstractThe phenomenon of the learning effect has been extensively studied in many different areas of operational research. However, there have been a few studies in the general context of production scheduling; also there have been fewer studies in flow-shop. Until the beginning of 1990 Earliness/Tardiness (E/T) problem was known as weighted absolute deviation problem. Not only tardiness but also earliness is very important performance criteria for scheduling problem. While total tardiness criteria provides adaptation for due date (ignoring results of earliness done jobs), it deals with only cost of tardiness. However this phenomenon has been started to change with Just in Time (JIT) production concept. Earliness is as important as tardiness on JIT production. In this study, the integer programming was suggested to take in to consideration “weighted E/T performance criteria and learning effect process property at the two machine flow-shop scheduling” and solution results was evaluated with sample problems by us.en_US
dc.language.isoturen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.titleİki makine akış tipi öğrenme etkili çizelgelemede ortak teslim tarihinden mutlak sapmaların en küçüklenmesien_US
dc.title.alternativeThe minimization of absolute deviation from common due date in two machine flowshop scheduling with learning effecten_US
dc.typearticleen_US
dc.identifier.volume24en_US
dc.identifier.issue2en_US
dc.identifier.startpage351en_US
dc.identifier.endpage357en_US
dc.relation.journalGazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisien_US
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster