Gultekin, NazliEren, Tamer2020-06-252020-06-252014Gültekin N., Eren T. (2014). Demiryolu Çizelgeleme Probleminin Modellenmesi Ve Çözümü. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 29(2), 235 - 242.1300-18841304-4915https://hdl.handle.net/20.500.12587/5918In this study, to find solutions to problems related to delays in train suggestions were made. In this paper, first of all Yenicubuk-Cetinkaya railway which have 16 stations and 6 trains worked on, was handled and 0-1 integer programming was proposed to reduce the delays. Train time schedules were regulated with data obtained from solution of this model and delays have been improved by 81.59 %. Also, it was shown, that the delays can be improved 96.52 % by simulating the case of changing 31 km railway line out of totally 240 km with double railway line.trinfo:eu-repo/semantics/closedAccessRailway schedulingtardiness0-1 integer programmingsimulationModelling And Solving The Railway Scheduling ProblemArticle2922352422-s2.0-84903266109Q2trdizinikyokturWOS:000339152800003Q4