Basit öğe kaydını göster

dc.contributor.authorOzder, Emir Huseyin
dc.contributor.authorOzcan, Evrencan
dc.contributor.authorEren, Tamer
dc.date.accessioned2020-06-25T18:30:31Z
dc.date.available2020-06-25T18:30:31Z
dc.date.issued2019
dc.identifier.citationÖzder EH, Özcan E, Eren T. Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant. Processes. 2019; 7(10):702.en_US
dc.identifier.issn2227-9717
dc.identifier.urihttps://doi.org/10.3390/pr7100702
dc.identifier.urihttps://hdl.handle.net/20.500.12587/7665
dc.descriptionOZCAN, Evren Can/0000-0002-3662-6190; Ozder, Emir Huseyin/0000-0002-1895-8060en_US
dc.descriptionWOS: 000495436200064en_US
dc.description.abstractThis paper deals with a sustainable personnel scheduling problem of personnel working in a large-scale natural gas combined-cycle power plant in Turkey. The proposed model focuses on employee complaints due to unfair work schedules and the results of balanced assignments based on power plant interruptions. Eighty personnel work in three shifts at this natural gas combined-cycle power plant. The model is solved with respect to some of the workers' skills, and there are 20 criteria regarding skills. The analytic network process method is used to get the weights of workers' skills, which are calculated and included in the model. Goal programming is used in this paper. Our proposed model gives cost minimization and fair work schedules for the power plant. Compared with the literature, the number and set of criteria are unique in terms of personnel competency in the energy sector. Minimizing cost and imbalanced assignments was achieved by the proposed model for the first time without considering the sector.en_US
dc.language.isoengen_US
dc.publisherMdpien_US
dc.relation.isversionof10.3390/pr7100702en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectskill-based personnel schedulingen_US
dc.subjectanalytic network process (ANP)en_US
dc.subjectgoal programming (GP)en_US
dc.subjectoptimizationen_US
dc.subjectnatural gas combined-cycle power planten_US
dc.subjectelectricity generation sectoren_US
dc.titleSustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Planten_US
dc.typearticleen_US
dc.contributor.departmentKırıkkale Üniversitesien_US
dc.identifier.volume7en_US
dc.identifier.issue10en_US
dc.relation.journalProcessesen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster