Ara
Toplam kayıt 1949, listelenen: 1941-1949
An application of investment decision with random fuzzy outcomes
(Pergamon-Elsevier Science Ltd, 2010)
In this study, an investment problem associated with purchasing machine is solved by using decision trees method. The main difference of this paper from the others in the decision tree literature is using random fuzzy ...
Convergence of the q analogue of Szasz-Beta operators
(Elsevier Science Inc, 2010)
In the present paper we introduce the q analogue of the well known Szasz-Beta operators [11]. We also establish the approximation properties of these operators and estimate convergence results. In the end we propose an ...
Finite element analysis of the beam strengthened with prefabricated reinforced concrete plate
(Academic Journals, 2010)
Various strengthening methods were frequently carried out in the world to strengthen weaker cross section beams. In this study, one beam strengthened by bonding with a prefabricated plate which has 80 mm thickness underneath ...
A note on Baskakov-Kantorovich type operators preservinge(-x)
(WILEY, 2020)
In this paper, we give a generalization of the Baskakov-Kantorovich type operators that reproduce functionse(0)ande(-x). We discuss uniform convergence of this generalization by means of the modulus of continuity and ...
Performance of engineered cementitious composites under drop-weight impact: Effect of different mixture parameters
(Ernst & Sohn, 2019)
Current research focuses on the experimental and numerical determination of impact performance of engineered cementitious composites (ECC). Performance assessment of ECC beams with different mixture parameters was made. ...
Anatomy of the Ulnar Tunnel and the Influence of Wrist Motion on Its Morphology
(W B Saunders Co-Elsevier Inc, 2010)
…
Analysis of bowl effects on assembly line using queueing networks and constraint programming procedure
(Computers and Industrial Engineering, 2014)
In this study, a new solution procedure based on queueing networks and constraint programming is proposed to model and solve the Assembly Line Balancing Problem (ALBP). Variation of the task and the station times, and ...