Yazar "Guner, Ertan" seçeneğine göre listele
Listeleniyor 1 - 2 / 2
Sayfa Başına Sonuç
Sıralama seçenekleri
Öğe A bicriteria flowshop scheduling with a learning effect(Elsevier Science Inc, 2008) Eren, Tamer; Guner, ErtanIn many situations, a worker's ability improves as a result of repeating the same or similar tasks; this phenomenon is known as the learning effect. In this paper the learning effect is considered in a two-machine flowshop. The objective is to find a sequence that minimizes a weighted sum of total completion time and makespan. Total completion time and makespan are widely used performance measures in scheduling literature. To solve this scheduling problem, an integer programming model with n(2) + 6n variables and 7n constraints where n is the number of jobs is formulated. Because of the lengthy computing time and high computing complexity of the integer programming model, the problem with up to 30 jobs can be solved. A heuristic algorithm and a tabu search based heuristic algorithm are presented to solve large size problems. Experimental results show that the proposed heuristic methods can solve this problem with up to 300 jobs rapidly. According to the best of our knowledge, no work exists on the bicriteria flowshop with a learning effect. (c) 2007 Elsevier Inc. All rights reserved.Öğe The tricriteria flowshop scheduling problem(Springer London Ltd, 2008) Eren, Tamer; Guner, ErtanMulticriteria flowshop scheduling problems have been one of the most attractive subjects in recent years. In the multicriteria flowshop scheduling literature, a very limited number of studies have been performed on problems which include a tardiness criterion. In this paper a multicriteria (tricriteria) two-machine flowshop scheduling problem with a tardiness criterion is tackled. The objective is to minimise a weighted sum of total completion time, total tardiness and makespan. An integer programming model is proposed for the problem which belongs to NP-hard class. The modified NEH (Nawaz, Enscore and Ham) algorithm, a tabu search-based heuristic method, random search and the EDD rule (the earliest due date rule) are used to solve problems with up to 2,500 jobs. A computational analysis is conducted to evaluate the performance of the heuristics. The analysis shows that the heuristics are quite efficient, and the performance of the tabu search based heuristic is the best of all in terms of solution quality.










