Otomatik yönlendirmeli araç sistemlerinde akış yol tasarımı
(2004)
Otomatik yönlendirmeli araç sistemleri malzeme taşıma sistemleri içinde yüksek esnekliğe ve birçok avantajlara sahip bulunan, yük toplama/dağıtım istasyonları arasındaki yönlü rotalarda dolaşan, sürücüsüz araçlardır. Bu ...
Prioritization of high-speed rail projects
(2018)
In recent years, intercity transportation has gained momentum towards high-speed rail in Turkey.Ankara-Konya, Ankara-Eskişehir and Istanbul lines were opened for high-speed transportation inthis area. There are still ...
Minimizing total tardiness in a scheduling problem with a learning effect
(Elsevier Science Inc, 2007)
Minimizing of total tardiness is one of the most studied topics on single machine problems. Researchers develop a number of optimizing and heuristic methods to solve this NP-hard problem. In this paper, the problem of ...
A multicriteria flowshop scheduling problem with setup times
(Elsevier Science Sa, 2007)
Most of research in production scheduling is concerned with the minimization of a single criterion. However, scheduling problems often involve more than one aspect and therefore require multicriteria analysis. In this ...
A bicriteria scheduling problem with a learning effect: Total completion time and total tardiness
(Taylor & Francis Inc, 2007)
This paper considers a bicriteria scheduling problem with a learning effect on a single machine to minimize a weighted sum of total completion time and total tardiness. A mathematical programming model is developed for the ...
A bicriteria scheduling with sequence-dependent setup times
(Elsevier Science Inc, 2006)
In this paper a bicriteria scheduling problem with sequence-dependent setup times on a single machine is considered. The objective function of the problem is minimization of the weighted sum of total completion time and ...
Minimizing the total weighted completion time on a single machine scheduling with release dates and a learning effect
(Elsevier Science Inc, 2009)
In this study, single machine scheduling problem with unequal release dates and a learning effect is considered. The objective function of the problem is minimization of the total weighted completion time. A non-linear ...
A bicriteria parallel machine scheduling with a learning effect of setup and removal times
(Elsevier Science Inc, 2009)
In studies oil scheduling problems, generally setup times and removal times of jobs have been neglected or by including those into processing times. However, in some production systems, setup times and removal times are ...
A bicriteria parallel machine scheduling with a learning effect
(Springer London Ltd, 2009)
Conventionally, job processing times are assumed to be constant from the first job to be processed until the last job to be completed. However, recent empirical studies in several industries have verified that unit costs ...
Minimizing the maximum lateness in a scheduling problem with a time-dependent learning effect: A non-linear programming model
(Gazi Univ, Fac Engineering Architecture, 2008)
In traditional scheduling problems, most literature assumes that the processing time of a job is fixed. However, there are many situations where the processing time of a job depends on the starting time or the position of ...