Hidroelektrik Santrallerde Vardiya Çizelgeleme Problemleri İçin Hedef Programlama Yaklaşımı
(2017)
Kuruluşların hitap ettikleri kitleleri en üst seviyede memnun etmeleri, kâr ve sistem verimi maksimizasyonu ile maliyet minimizasyonu gibi üst ölçekteki hedeflere ulaşmaları birçok parametre üzerinde yoğunlaşmalarını gerekli ...
A bicriteria flowshop scheduling problem with setup times
(Elsevier Science Inc, 2006)
Most of research in production scheduling is concerned with the minimization of a single criterion. However, scheduling problems often involve more than one aspect and therefore require bicriteria analysis. In this study, ...
A bicriteria scheduling with sequence-dependent setup times
(Elsevier Science Inc, 2006)
In this paper a bicriteria scheduling problem with sequence-dependent setup times on a single machine is considered. The objective function of the problem is minimization of the weighted sum of total completion time and ...
Minimizing total tardiness in a scheduling problem with a learning effect
(Elsevier Science Inc, 2007)
Minimizing of total tardiness is one of the most studied topics on single machine problems. Researchers develop a number of optimizing and heuristic methods to solve this NP-hard problem. In this paper, the problem of ...
A multicriteria flowshop scheduling problem with setup times
(Elsevier Science Sa, 2007)
Most of research in production scheduling is concerned with the minimization of a single criterion. However, scheduling problems often involve more than one aspect and therefore require multicriteria analysis. In this ...
A bicriteria scheduling problem with a learning effect: Total completion time and total tardiness
(Taylor & Francis Inc, 2007)
This paper considers a bicriteria scheduling problem with a learning effect on a single machine to minimize a weighted sum of total completion time and total tardiness. A mathematical programming model is developed for the ...
A bicriteria flowshop scheduling with a learning effect
(Elsevier Science Inc, 2008)
In many situations, a worker's ability improves as a result of repeating the same or similar tasks; this phenomenon is known as the learning effect. In this paper the learning effect is considered in a two-machine flowshop. ...
The tricriteria flowshop scheduling problem
(Springer London Ltd, 2008)
Multicriteria flowshop scheduling problems have been one of the most attractive subjects in recent years. In the multicriteria flowshop scheduling literature, a very limited number of studies have been performed on problems ...
Human and Machine Effects in a Just-In-Time Scheduling Problem
(John Wiley & Sons Inc, 2009)
In this article, single-machine scheduling problems with learning effects of setup and removal times and deterioration effects of processing time are considered. The objective function of the problem is minimization of the ...
A note on minimizing maximum lateness in an m-machine scheduling problem with a learning effect
(Elsevier Science Inc, 2009)
Conventionally, job processing times are assumed to be constant from the first job to be processed until the last job to be completed. However, recent empirical studies in several industries have verified that unit costs ...