Ara
Toplam kayıt 149, listelenen: 1-10
Otomatik yönlendirmeli araç sistemlerinde akış yol tasarımı
(2004)
Otomatik yönlendirmeli araç sistemleri malzeme taşıma sistemleri içinde yüksek esnekliğe ve birçok avantajlara sahip bulunan, yük toplama/dağıtım istasyonları arasındaki yönlü rotalarda dolaşan, sürücüsüz araçlardır. Bu ...
Prioritization of high-speed rail projects
(2018)
In recent years, intercity transportation has gained momentum towards high-speed rail in Turkey.Ankara-Konya, Ankara-Eskişehir and Istanbul lines were opened for high-speed transportation inthis area. There are still ...
Minimizing mean flow time in a flowshop scheduling with learning effect
(2004)
The phenomenon of the learning effect has been extensively studied in many different areas of operational research. However, there have been very few studies in the general context of production scheduling. These studies ...
Performance evaluation of closed queueing networks with limited capacities
(2006)
An algorithm was developed for performance evaluation of single class closed queueing networks with configurations likely to occur in real-world manufacturing systems, i.e. limited waiting spaces, split-merge topologies, ...
Prediction of wind speed and power in the Central Anatolian region of Turkey by adaptive neuro-fuzzy inference systems (ANFIS)
(2006)
An adaptive neuro-fuzzy inference systems (ANFIS) model was used for predicting regional average wind speed and power values in the Central Anatolian region of Turkey. In model development, longitude, latitude and altitude ...
Application of multivariate statistical process control in casting industry
(2007)
The purpose of quality control charts is to detect abnormal behavior of quality variables and to determine the causes of quality problems using these abnormalities. Hotelling's T2 charts, the most popular multivariate ...
Setup times with a learning effect in flowshop scheduling problem
(2007)
Relevant to recent scheduling studies, setup times of jobs have generally been either neglected or considered in processing times. But, in some production systems the setup times may be so large that it can not be neglected ...
Fault diagnosis of shaft- Ball bearing system using one-way analysis of variance
(Association for Scientific Research, 2014)
Roller bearing is one of the most widely used and critical elements in rotating machinery. In consequence, bearing fault diagnosis in machines, as well as to discriminate the different fault conditions have been a great ...
Minimizing total tardiness in a scheduling problem with a learning effect
(Elsevier Science Inc, 2007)
Minimizing of total tardiness is one of the most studied topics on single machine problems. Researchers develop a number of optimizing and heuristic methods to solve this NP-hard problem. In this paper, the problem of ...
A multicriteria flowshop scheduling problem with setup times
(Elsevier Science Sa, 2007)
Most of research in production scheduling is concerned with the minimization of a single criterion. However, scheduling problems often involve more than one aspect and therefore require multicriteria analysis. In this ...