Due Date Single Machine Scheduling Problems with Nonlinear Deterioration and Learning Effects and Past Sequence Dependent Setup Times
Yükleniyor...
Tarih
2014
Yazarlar
Dergi Başlığı
Dergi ISSN
Cilt Başlığı
Yayıncı
Hindawi Ltd
Erişim Hakkı
info:eu-repo/semantics/openAccess
Özet
We present some problems against due dates with nonlinear learning and deterioration effects and past sequence dependent setup times. In this study, two effects (learning and deterioration) are used for the same processing time. The processing time of a job is shorter if it is scheduled later, rather than in the sequence. This phenomenon is known in the literature as a "learning effect." On the other hand, in many realistic scheduling settings, a job processed later consumes more time than the same job processed earlier-this is known as scheduling with deteriorating jobs. In the past sequence dependent setup times approach, the setup time of a job is proportionate to the sum of processing times of the jobs already scheduled. In this study, we demonstrated that some problems with due dates remain polynomially solvable. However, for some other problems, we concentrated on finding polynomially solves under their special cases.
Açıklama
Anahtar Kelimeler
Kaynak
Mathematical Problems In Engineering
WoS Q Değeri
Q3
Scopus Q Değeri
Q1
Cilt
2014
Sayı
Künye
Hüseyin Ceylan, "Due Date Single Machine Scheduling Problems with Nonlinear Deterioration and Learning Effects and Past Sequence Dependent Setup Times", Mathematical Problems in Engineering, vol. 2014, Article ID 682738, 7 pages, 2014.