Shift Scheduling with the Goal Programming Method: A Case Study in the Glass Industry

dc.contributor.authorKacmaz, Ozlem
dc.contributor.authorAlakas, Haci Mehmet
dc.contributor.authorEren, Tamer
dc.date.accessioned2020-06-25T18:34:02Z
dc.date.available2020-06-25T18:34:02Z
dc.date.issued2019
dc.departmentKırıkkale Üniversitesi
dc.descriptionEren, Tamer/0000-0001-5282-3138
dc.description.abstractNowadays, resource utilization and management are very important for businesses. They try to make a profit by providing high levels of efficiency from available sources. Their labor force is one of these sources. Therefore, scheduling based on personnel satisfaction has become an important problem in recent years. In this study, a case study was carried out in a glass factory in Ankara which has 7 department and 80 personnel. The aim of the study is to provide better service by distributing personnel to shifts in a fair and balanced manner. Assignment points are different for the departments where the personnel will work. Every personnel member is assigned to the department as best as possible. A goal programming method was used, and the results were better than those obtained using other methods.en_US
dc.identifier.citationKaçmaz Ö., Alakaş H.M., Eren T. Shift Scheduling with the Goal Programming Method: A Case Study in the Glass Industry. Mathematics. 2019; 7(6):561.en_US
dc.identifier.doi10.3390/math7060561
dc.identifier.issn2227-7390
dc.identifier.issue6en_US
dc.identifier.scopus2-s2.0-85069953055
dc.identifier.scopusqualityQ1
dc.identifier.urihttps://doi.org/10.3390/math7060561
dc.identifier.urihttps://hdl.handle.net/20.500.12587/7760
dc.identifier.volume7en_US
dc.identifier.wosWOS:000475299100077
dc.identifier.wosqualityQ1
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherMdpien_US
dc.relation.ispartofMathematics
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectshift scheduleen_US
dc.subjectgoal programmingen_US
dc.subjectlaboren_US
dc.subjectassignmenten_US
dc.subjectpersonnelen_US
dc.titleShift Scheduling with the Goal Programming Method: A Case Study in the Glass Industryen_US
dc.typeArticle

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
Shift Scheduling with the Goal Programming Method A Case Study in the Glass Industry.pdf
Boyut:
2.74 MB
Biçim:
Adobe Portable Document Format
Açıklama:
Tam Metin/Full Text