A new approach to determine maintenance periods of the most critical hydroelectric power plant equipment

dc.contributor.authorBulut, Merve
dc.contributor.authorÖzcan, Evrencan
dc.date.accessioned2021-01-14T18:10:19Z
dc.date.available2021-01-14T18:10:19Z
dc.date.issued2021
dc.departmentKKÜ
dc.descriptionBulut, Merve/0000-0002-4412-9071
dc.description.abstractPower plants are large-scale generation facilities with high investment costs established to ensure sustainable energy supply. Maintenance-Repair activities constitute the most critical process to be considered in these facilities. Because, these activities cause planned or unplanned generation interruptions. For this reason, it is of great importance to calculate the maintenance periods determined on the basis of equipment health in the power plants. From this point of view in this study, the problem of determining maintenance periods is handled in the big scale hydroelectric power plant in Turkey. Due to the complexity of problem environment particularly including 16 equipment groups with the highest level of criticality on the power plant, proposing combined multi criteria decision making model (MCDM) has become invaluable for the purpose of reaching convincing outcomes. In order to obtain maximum benefit, investigation for appropriate probability distributions of 11-year failure and repair data belonging to the equipment group and analyses for reliability, availability and maintainability analyses are performed for 16 critical equipment groups. Finally, maintenance periods for 16 equipment groups were calculated using the curve family formed by the cost coefficient of Weibull distribution parameters. On the specified maintenance days based on system reliability and maintenance costs, it was observed that 16 critical equipment had no failures during the 1-year monitoring process. This indicates a 100% improvement.en_US
dc.identifier.citationclosedAccessen_US
dc.identifier.doi10.1016/j.ress.2020.107238
dc.identifier.issn0951-8320
dc.identifier.issn1879-0836
dc.identifier.scopus2-s2.0-85090944600
dc.identifier.scopusqualityQ1
dc.identifier.urihttps://doi.org/10.1016/j.ress.2020.107238
dc.identifier.urihttps://hdl.handle.net/20.500.12587/12497
dc.identifier.volume205en_US
dc.identifier.wosWOS:000589091300023
dc.identifier.wosqualityQ1
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherELSEVIER SCI LTDen_US
dc.relation.ispartofRELIABILITY ENGINEERING & SYSTEM SAFETY
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectMaintenance periodsen_US
dc.subjectWeibull distributionen_US
dc.subjectHydroelectric power planten_US
dc.subjectAHPen_US
dc.subjectTOPSISen_US
dc.titleA new approach to determine maintenance periods of the most critical hydroelectric power plant equipmenten_US
dc.typeArticle

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
[ X ]
İsim:
A new approach to determine maintenance periods of the most critical hydroelectric power plant equipment.pdf
Boyut:
3.18 MB
Biçim:
Adobe Portable Document Format
Açıklama:
Tam Metin/Full Text